Qty 2 MOV - Metal Oxide Varistor - S20K130 Seimens 130VAC 8000 Amp w/long leads
When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
Qty 2 MOV - Metal Oxide Varistor - S20K130 Seimens 130VAC 8000 Amp w/long leads:
$6.25
Qty 2 - 130VAC 8,000Amps MOVs
Siemens
S20K130
130 VAC 8,000 Amp Rated MOV\'s with long leads
New Item Guaranteed.
EXCELLENT CONDITION
*** Great Device for Building Power Surge Protection against Line Voltage Spikes ***
Our Comments about these Siemens S20K130 MOVs:
These Siemens are high quality MOVs that are new unused left-over production from manufacturing. This particular MOV was chosen for production of a high quality power conditioner because of its tested performance and reliability. These are new and will ship in a protective bubble package envelope.
- Round varistor element, leaded
- Coating: epoxy resin, flame-retardant to UL 94 V-0
- Terminals: tinned copper wire
- Wide operating voltage range 11 … 1100 VRMS
- High surge current ratings up to 8 kA
- No derating up to 85 °C ambient temperature
- PSpice models
- UL
- CSA (all types ³ K115)
- VDE
- CQC S05/07 (K11 … K460), S10/S14 (K11 … K680), S20 (K11 … class=\"productTextKeyFeatures\" style=\"list-style-position: outside; background-color: rgb(255, 255, 255);\">
- S20* types with lead spacing 7.5 mm
Manufacture\'s Technical Specifications:
General technical data
- Climatic category to IEC 60068-1 40/85/56
- Operating temperature to IEC 61051-40 ... + 85°C
- Storage temperature-40 ... +125°C
- Electric strength to IEC 61051³2.5 kVRMS
- Insulation resistance to IEC 61051³100 MW
- Response time < 25 ns
Maximum ratings (TA= 85°C)
- Type: S20K130
- VRMS:130 VAC
- VDC:170 Volts
- imax(8/20μs): 8000 Amps
- Wmax(2ms):74.0 Joules
- Pmax:1.0 Watts
Guarantee:
Returns Policy:
Returns are accepted within30 days of you receiving product.Product must be returned in same condition as sent, with any and all accessories received.
Payments:
I accept payment using PayPal and will ship to confirm PayPal addresses.
Payment is process at the close of the sale.
International Buyers:
I do sell internationally using \'s International services. Please note that they determine the cost to send from the USA to you.
Please Note: Import duties, taxes and charges are not included in the item price or shipping charges. These charges are to be paid by the buyer. Please check with yourcountry\'scustoms office to determine what these additional costs will be prior to offerding/buying. These charges are normally collected by the delivering freight (shipping) company or when you pick the item up do not confuse them for additional shipping charges. We do not mark merchandise values below value or mark items as gifts - US and International government regulations prohibit such behavior.